{"id":3528,"date":"2025-09-11T17:07:17","date_gmt":"2025-09-11T20:07:17","guid":{"rendered":"https:\/\/www.h2magallanes.cl\/?post_type=news&#038;p=3528"},"modified":"2025-09-25T17:22:33","modified_gmt":"2025-09-25T20:22:33","slug":"https-www-h2magallanes-cl-noticias-firma-de-convenio-con-la-direccion-de-vialidad-del-ministerio-de-obras-publicas","status":"publish","type":"news","link":"https:\/\/www.h2magallanes.cl\/en\/noticias\/https-www-h2magallanes-cl-noticias-firma-de-convenio-con-la-direccion-de-vialidad-del-ministerio-de-obras-publicas\/","title":{"rendered":"Signing of an agreement with Vialidad Direction of the Ministry of Public Works"},"content":{"rendered":"<p>Signing of an agreement with Vialidad Direction of the Ministry of Public Works.Published on: 23\/09\/2025.Signing of an agreement with Vialidad Direction of the Ministry of Public Works.On Tuesday, September 23, we signed an agreement with the Highway Directorate of the Ministry of Public Works (MOP) that will allow us to carry out modification, improvement, and maintenance works on public roads in our area of \u200b\u200binfluence.<br \/>\nWe know that during the construction phase, there will be a high traffic of materials, machinery, and workers. Therefore, our commitment is clear: to ensure that this movement is carried out safely, maintaining the region&#8217;s connectivity and avoiding impacts on the daily lives of the communities.<\/p>\n<p>The interventions we will carry out include roadway conditioning and widening; structural reinforcement and construction of new crossings and bridges when necessary; improvements to access, livestock guards, and drainage systems; and ongoing maintenance of existing roads.<br \/>\nAll of these works will be financed by us, executed by companies registered with the MOP, and directly supervised by the Highway Directorate. Once completed, they will become national assets for public use under its administration.<\/p>\n<p>As the H2 Magallanes Project, we have taken on the challenge of advancing the development of green hydrogen alongside concrete infrastructure improvements for the region. As our general manager, Antoine Liane, stated: &#8220;With this agreement, we aim to achieve the transit of our cargo from Punta Arenas without impacting connectivity to Argentina and Tierra del Fuego, all at the company&#8217;s expense and in compliance with the standards of the Highway Department.&#8221;<\/p>\n<p>This agreement is an example of how public-private cooperation can generate shared value: we are driving the energy transition while strengthening Magallanes&#8217; connectivity..Discover More News.Signing of an agreement with Vialidad Direction of the Ministry of Public Works.On Tuesday, September 23, we signed an agreement with the Highway Directorate of the Ministry of Public Works (MOP) that will allow us to carry out modification, improvement, and maintenance works on public roads in our area of \u200b\u200binfluence.<br \/>\nWe know that during the construction phase, there will be a high traffic of materials, machinery, and workers. Therefore, our commitment is clear: to ensure that this movement is carried out safely, maintaining the region&#8217;s connectivity and avoiding impacts on the daily lives of the communities.<\/p>\n<p>The interventions we will carry out include roadway conditioning and widening; structural reinforcement and construction of new crossings and bridges when necessary; improvements to access, livestock guards, and drainage systems; and ongoing maintenance of existing roads.<br \/>\nAll of these works will be financed by us, executed by companies registered with the MOP, and directly supervised by the Highway Directorate. Once completed, they will become national assets for public use under its administration.<\/p>\n<p>As the H2 Magallanes Project, we have taken on the challenge of advancing the development of green hydrogen alongside concrete infrastructure improvements for the region. As our general manager, Antoine Liane, stated: &#8220;With this agreement, we aim to achieve the transit of our cargo from Punta Arenas without impacting connectivity to Argentina and Tierra del Fuego, all at the company&#8217;s expense and in compliance with the standards of the Highway Department.&#8221;<\/p>\n<p>This agreement is an example of how public-private cooperation can generate shared value: we are driving the energy transition while strengthening Magallanes&#8217; connectivity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Signing of an agreement with Vialidad Direction of the Ministry of Public Works.Published on: 23\/09\/2025.Signing of an agreement with Vialidad Direction of the Ministry of Public Works.On Tuesday, September 23, we signed an agreement with the Highway Directorate of the Ministry of Public Works (MOP) that will allow us to carry out modification, improvement, and [&hellip;]<\/p>\n","protected":false},"author":5,"parent":0,"menu_order":0,"template":"news_modules","news_tax":[14,21],"class_list":["post-3528","news","type-news","status-publish","hentry","news_tax-category-1","news_tax-public-private-collaboration"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/news\/3528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":7,"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/news\/3528\/revisions"}],"predecessor-version":[{"id":3601,"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/news\/3528\/revisions\/3601"}],"wp:attachment":[{"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/media?parent=3528"}],"wp:term":[{"taxonomy":"news_tax","embeddable":true,"href":"https:\/\/www.h2magallanes.cl\/en\/wp-json\/wp\/v2\/news_tax?post=3528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}